120gpm Amine Plant Boiler Upgrade

TRANSTEX TREATING, HOUSTON, TEXAS Tell us more about your project
Header image for Profire customer success story case study

Project Highlights

  • Complete Automated Control
  • Updated Burner Management Controls
  • Updated Burner Management Controls
  • Updated Burner Management Controls
  • Increased Efficiency and Reliability
  • Increased Operator Safety and Control Visibility

Have Similar Equipment?

Tell us about your next project

Get a Free Quote

The Problem

The client purchased a second-hand Bryan Boiler with outdated controls and inefficient air to fuel ration control. The client wanted to integrate this boiler into their 120GPM Amine Plant to control customer CO2 levels. The existing controls on the Bryan Boiler did not function properly and would not have created a safe environment during operation if not replaced with a new, safe and efficient Burner Management System.

Sound Familiar? Let's Talk

Before Profire

Industrial burner system before Profire upgrade – case study before photo
Industrial burner components before Profire upgrade – case study before photo

The Profire Solution

Profire designed a full system solution for the Bryan Boiler, which included the following:

  1. PF3100 Burner System Controller with Stainless Enclosure which manages the pilot and burner ignition, Fuel-Air ratio control.
  2. UV Flame Detection Sensor to increase combustion and operator safety.
  3. Boiler Temperature and Process Temperatures
  4. NFPA87 compliant fuel train and safety controls

This package solution provided maximum heat output from the system safely, while meeting the target temperatures in record time with less fuel consumption due to the efficiency of the forced draft burner design with the new controls. This allowed the customer to operate the Amine Plant at maximum GPM production during colder than normal temperatures without any problems.

Get a Free Quote

After Profire

Industrial burner system after Profire upgrade – case study after photo
Industrial burner installation after Profire upgrade – case study after photo
Industrial burner components after Profire upgrade – case study after photo
Industrial burner equipment after Profire upgrade – case study after photo
Industrial burner system close-up after Profire upgrade – case study after photo
Industrial burner field view after Profire upgrade – case study after photo

Ready to Optimize your Equipment?

Let Profire help with your Safety, Reliability, and ESG Initiatives

Get a Free Quote

Recent Projects

Dual-Tube Horizontal Heater… Oil & Gas – Upstream
Details

A leading Oil & Gas producer operated 148 aging dual-tube horizontal heater treaters running on pneumatic…

See Details
CWT Vacuum Heater… Oil & Gas – Downstream / Utility
Details

At a natural gas utility site in Ontario, a installed Tecvalco CWT Vacuum Heater was exposed…

See Details
Multi-Burner Direct Fired… Chemical & Petrochemical
Details

Trecora operated 8 aging multi-burner natural-draft process heaters that were becoming harder to support. The heaters…

See Details