Industrial heater site after Profire BMS installation – case study after photo

Project Highlights

  • 12 Burner Cabin Heater - 41 MM BTU
  • Independent Pilot Control
  • Fuel Gas Savings of +30%
  • 40+ Safety I/O Monitored from the control room
  • Multiple Temperature Inputs
  • Provided Reliable & Safe Ignition and Flame Detection

Have Similar Equipment?

Tell us about your next project

Get a Free Quote

The Problem

Our client came to us feeling frustrated with the inefficiency of their Burner Management System. The absence of controls not only risked their safety when manually lighting their heater, they had unreliable flame detection and limited communications to properly notify their personnel when the flame(s) when out.

Sound Familiar? Let's Talk

Before Profire

Industrial heater system before Profire BMS installation – case study before photo
Industrial heater equipment before Profire BMS installation – case study before photo
Industrial heater wiring before Profire BMS installation – case study before photo
Industrial heater control panel before Profire BMS installation – case study before photo
Industrial heater site before Profire BMS installation – case study before photo

The Profire Solution

Profire installed a new PF3100 Burner Management System to safely ignite the heater and communicate with the client’s control room on the status of the heater. From conceptional design, accurate estimate, installation and commissioning, Profire assisted the client through the entire process. “Their safe and reliable BMS will surely provide ROI in less than a year!”

Get a Free Quote

After Profire

Industrial heater control panel after Profire BMS installation – case study after photo
Industrial heater equipment after Profire BMS installation – case study after photo
Industrial heater site after Profire BMS installation – case study after photo
Industrial heater field overview after Profire BMS installation – case study after photo
Industrial heater wiring after Profire BMS installation – case study after photo

Ready to Optimize your Equipment?

Let Profire help with your Safety, Reliability, and ESG Initiatives

Get a Free Quote

Recent Projects

Dual-Tube Horizontal Heater… Oil & Gas – Upstream
Details

A leading Oil & Gas producer operated 148 aging dual-tube horizontal heater treaters running on pneumatic…

See Details
CWT Vacuum Heater… Oil & Gas – Downstream / Utility
Details

At a natural gas utility site in Ontario, a installed Tecvalco CWT Vacuum Heater was exposed…

See Details
Multi-Burner Direct Fired… Chemical & Petrochemical
Details

Trecora operated 8 aging multi-burner natural-draft process heaters that were becoming harder to support. The heaters…

See Details