12 Burner Hot Oil Cabin Heater

MIDSTREAM FACILITY IN NEW MEXICO Tell us more about your project
Industrial heater site after Profire BMS installation – case study after photo

Project Highlights

  • 12 Burner Cabin Heater - 41 MM BTU
  • Independent Pilot Control
  • Fuel Gas Savings of +30%
  • 40+ Safety I/O Monitored from the control room
  • Multiple Temperature Inputs
  • Provided Reliable & Safe Ignition and Flame Detection

Have Similar Equipment?

Tell us about your next project

Get a Free Quote

The Problem

Our client came to us feeling frustrated with the inefficiency of their Burner Management System. The absence of controls not only risked their safety when manually lighting their heater, they had unreliable flame detection and limited communications to properly notify their personnel when the flame(s) when out.

Sound Familiar? Let's Talk

Before Profire

Industrial heater system before Profire BMS installation – case study before photo
Industrial heater equipment before Profire BMS installation – case study before photo
Industrial heater wiring before Profire BMS installation – case study before photo
Industrial heater control panel before Profire BMS installation – case study before photo
Industrial heater site before Profire BMS installation – case study before photo

The Profire Solution

Profire installed a new PF3100 Burner Management System to safely ignite the heater and communicate with the client’s control room on the status of the heater. From conceptional design, accurate estimate, installation and commissioning, Profire assisted the client through the entire process. “Their safe and reliable BMS will surely provide ROI in less than a year!”

Get a Free Quote

After Profire

Industrial heater control panel after Profire BMS installation – case study after photo
Industrial heater equipment after Profire BMS installation – case study after photo
Industrial heater site after Profire BMS installation – case study after photo
Industrial heater field overview after Profire BMS installation – case study after photo
Industrial heater wiring after Profire BMS installation – case study after photo

Ready to Optimize your Equipment?

Let Profire help with your Safety, Reliability, and ESG Initiatives

Get a Free Quote

Recent Projects

Direct-Fired Forced-Draft Hot… Oil & Gas – Midstream
Details

Momentum Midstream was looking to expand operations at its Gillis Treating Facility in Ragley, Louisiana, adding…

See Details
Triple-Tube Line Heater… Oil & Gas – Midstream
Details

At Williams’ North Tacoma site, a Triple-Tube Line Heater struggled with frequent downtime due to an…

See Details
Candlestick Flare… Biogas
Details

Noble Environmental faced operational and compliance challenges at one of its landfills, requiring a reliable flare…

See Details