CECO ENVIRONMENTAL

Recent Projects

Landfill Dual Candlestick Flare for RNG Facility Expansion Project Highlights
  • Problem
  • Unable to support increased gas volumes
  • Faced compliance risks under strict EPA regulations
  • Solution
  • Dual candlestick flares w/ 12,000 SCFM capacity
  • Two PF2100F flare controllers w/ auto/on-demand ignition
See Details
Food & Beverage Low Temperature Spray Dryer Project Highlights
  • Problem
  • Unable to maintain process temperature below 41°C (105.8°F).
  • Low visibility required hands-on checks
  • Solution
  • PF3100 held temps below 41°C (105.8°F)
  • Modbus & logging added real-time insight
See Details
Oil & Gas – Midstream Forced Draft TEG Reboiler Project Highlights
  • Problem
  • Faced severe regulatory fines
  • Emitted >70 ppm NOx & 400 ppm CO
  • Solution
  • Reduced NOx <20 ppm & CO <1 ppm
  • Achieved 20% natural gas savings
See Details
Oil & Gas – Downstream / Utility Line Heater Upgrade Project Highlights
  • Problem
  • Lacked auto ignition and safety shutoff
  • Improper burner setup caused frequent blow outs
  • Solution
  • Installed two PF2100s for safe operation
  • Improved airflow for complete combustion
See Details
Oil & Gas – Midstream Main Burner Upgrade Project Highlights
  • Problem
  • Lacking a standalone pilot system.
  • Hazardous ignition system risking equipment and personnel.
  • Solution
  • High-efficiency pilot for reliable repeatability.
  • Mitigated hazards involving competitor products.
See Details
Reclamation Dual Pilot Forced Draft Flare Project Highlights
  • Problem
  • Required manual ignition
  • Unable to monitor pilot or flare status
  • Solution
  • Real-time data cut service callouts
  • Automated the pilot ignition system
See Details
Oil & Gas – Midstream 12 Burner Hot Oil Cabin Heater Project Highlights
  • Problem
  • Required manual ignition
  • Unreliable flame detection & monitoring
  • Solution
  • Auto ignition delivered 30% fuel savings
  • Remote monitoring for 40+ safety inputs
See Details
Oil & Gas – Upstream Amine Distillation – Cabin Heater Project Highlights
  • Problem
  • Flame failures caused 3+ daily shutdowns
  • Operators had to manually re-light
  • Solution
  • Auto relight & temp control saved 45% fuel
  • Reliable monitoring of 250+ safety inputs
See Details
Oil & Gas – Midstream 120gpm Amine Plant Boiler Upgrade Project Highlights
  • Problem
  • Lack of controls forced manual operation
  • Uneven air-fuel ratio hurt performance
  • Solution
  • Advanced controls improved output
  • NFPA 87-compliant trains & safety logic
See Details
Oil & Gas – Upstream Pre-packaged Systems for BMS Retrofits Project Highlights
  • Problem
  • Variable BMS setups created unsafe conditions
  • System reliability varied by appliance
  • Solution
  • Upgraded 200+ appliances with new system
  • Achieved ~2 hours downtime per upgrade
See Details
Power Generation Vacuum Boiler – Natural Gas Line Project Highlights
  • Problem
  • Unable to keep temps below 41°C (105.8°F)
  • Low visibility required hands-on checks
  • Solution
  • PF3100 held temps below 41°C (105.8°F)
  • Modbus & logging added real-time insight
See Details